Situation The Culver Cove Resort and Conference Center is an 80‑unit hotel‑condo complex located on Lake Maxinkuckee near Culver, Indiana. As a seasonal resort, there is a wide variation in hot water demand. Originally hot water was supplied from three utility rooms, each with six

CaseStudies-marriot-main

The Courtyard by Marriott

Situation The Courtyard by Marriott has to supply hot water on demand to 119 rooms as well as a laundry facility and a small restaurant. Demand varies greatly depending on the number of guests and restaurant traffic, so the hotel needed a system to provide the

case-brookschool-main

Brooks School

Situation The dining hall at Brooks School, a co-educational college preparatory boarding and day school, in North Andover, Massachusetts, used two inefficient 400,000 BTU boilers to heat a 300-gallon storage tank. With a $1.2 million dollar annual utility bill, the school was looking to reduce

biaggis-main

Biaggi’s Restorante Italiano

Situation Biaggi’s Ristorante in Deer Park, Illinois, found their inefficient 200-gallon tank could barely keep up with dishwashing demand and they would replace tanks every two or three years. Solution Gregg Bickus of Bickus Plumbing convinced the owners to replace their old system with four